Production

From first cell to series,
without changing address.

The scaling ladder that makes Amp-Hour the last supplier decision a program has to make.

Amp-Hour lithium battery cells
A-grade cells, produced in Germany
The ladder

Four stages.
One platform.

The line that runs your A-sample is the line that runs your up-to-100 MWh series — no requalification between stages.

S1From 1 MWh · A-grade

Research & Prototype

Campaigns from as little as 1 MWh. A-grade cells from the first run, not the hundredth.

Move up when the cell design is stable and A-grade output repeats.

S2Program qualification

Sample Phases (A/B)

A-sample and B-sample campaigns built for program qualification, not for a lab demo.

Move up when A/B samples clear your program qualification gates.

S3Up to ~30 MWh/yr

Ramp-up

Pilot-scale campaigns that prove the line before you commit to series.

Move up when the pilot line proves yield and consistency at rate.

S4Up to ~100 MWh/yr

Series Production

Modular lines, changeover in days — not months — between campaigns.

Full series — modular lines run campaign after campaign.

Modular lines

Changeover in days,
not months.

Modular minienvironment lines reconfigure between campaigns without rebuilding the floor. The line that ran your A-sample is the line that runs your up-to-100 MWh series.

  • Campaigns from 1 MWh. Batch sizes most manufacturers won't take — one of our USPs.
  • Customized supply chain. Tuned per program, from 100% local to partially local.
See the applications
Facility

Where "we can actually
produce this" gets proven.

Software-supported ramp-up on minienvironment lines in a controlled, German facility — the same lines that run your A-sample run your series.

Amp-Hour battery cell assembly line in GermanyMinienvironment cell lines · Aachen, Germany
FAQ

How the ladder
actually works.

What are the stages of Amp-Hour’s production ladder?

Amp-Hour scales across four stages on one modular platform: research and prototype (from 1 MWh), A/B sample phases, ramp-up, and series production.

What is the smallest campaign Amp-Hour will run?

Amp-Hour serves campaigns from as little as 1 MWh — a USP, since that batch size is too small for most manufacturers — and scales the same platform up to series.

How local is Amp-Hour’s supply chain?

Amp-Hour offers a customized supply chain, tuned per program from 100% local to partially local, alongside a one-way data flow that keeps customer IP inside the entity.

Start the campaign

Prove the line
before you commit to series.

Request a Campaign